PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Metal decking at 4th Floor Facing East (800x600).jpg Started fixing the main steel column Facing East  (800x600).jpg Started fixing the main steel column Facing South  (800x600).jpg Compacting around the foundation walls Facing South (800x600).jpg Installing underground piping at the boiler room Facing North  (800x600).jpg
Previous page Installing underground piping at the boiler room Facing North  (800x600)
Installing underground piping at the boiler room Facing North (800x600)